1512

SOLENOID PULL 12V
Mfr. Part Number
1512
Manufacturer
Adafruit
Datasheet
Description
SOLENOID PULL 12V
RoHS Status
Lead Free / RoHS Complaint
Availability
Sourcing — Lead time quoted on request (often 3–15 business days by channel)
sample
Free Sample
1512
Adafruit
Request a free sample for evaluation. We will contact you shortly.
* Mandatory Fields
*Quantity:
*Contact Name
Contact Name is required
Company Name
*Email
Email is required
Phone
*Country
Country is required
Your Question
Cancel
SUBMIT
In Stock2,407
Unit
Price
$14.95
Buy Now
Buy at reference price · Secure checkout
Get Quote
No payment required · Reply within 24h
Reference Price
QuantityPrice
1$ 14.9500
Prices are for reference only. The final transaction is subject to confirmation.
As of 2026-09-19 · Valid as reference until 2026-09-26 · Request RFQ for live stock.
Need a better price?

Specification Summary

Voltage - Rated
12VDC
Mounting Type
Chassis Mount
Diameter - Shaft
0.394" (10.00mm)
Duty Cycle
Intermittent
Shaft Detail
Slanted Slug
Size / Dimension
2.110" L x 0.945" W x 1.102" H (53.57mm x 24.00mm x 28.00mm)
Technology
Electromechanical
Termination Style
Wire Leads with Connector
Full specifications are listed below. Need alternates or BOM matching? Read BOM guide · Request a quote
Stock status: Sourcing — Lead time quoted on request (often 3–15 business days by channel)
Shortage / allocation / EOL lines may need longer — ask via RFQ.
Reference price and stock shown as of 2026-09-19. Confirm live availability and unit price via RFQ before placing a PO.
Specifications
Product Description
Purchase & Inquiry
Technology
Electromechanical
Power (Watts)
-
DC Resistance (DCR)
-
Bushing Thread
-
Shaft Detail
Slanted Slug
Mounting Type
Chassis Mount
Size / Dimension
2.110" L x 0.945" W x 1.102" H (53.57mm x 24.00mm x 28.00mm)
Type
Closed Frame (Pull)
Voltage - Rated
12VDC
Diameter - Shaft
0.394" (10.00mm)
Duty Cycle
Intermittent
Stroke Length
-
Termination Style
Wire Leads with Connector
SOLENOID PULL 12V
Brand Introduction

Adafruit is a fast growing global leader in educational electronics platforms, prototyping and development tools, operating out of a manufacturing facility in the heart of NYC. It was founded by Limor "Ladyada" Fried in 2005 and specializes in the design and fabrication of original electronic learning platforms, which Limor personally selects, tests and approves before releasing. Adafruit is in the vanguard of Open Source Hardware, striving to educate makers of all ages in the field of electronics and programming.

Founded by MIT engineer, Limor "Ladyada" Fried's goal was to create the best place online for learning electronics and making the best designed products for makers of all ages and skill levels. Adafruit has grown to over 50 employees in the heart of NYC with a 15,000+ sq ft. factory. Adafruit has expanded offerings to include tools, equipment and electronics that Limor personally selects, tests and approves before going in to the Adafruit store. Limor was the first female engineer on the cover of WIRED magazine and was recently awarded Entrepreneur magazine's Entrepreneur of the year. In 2014 Adafruit was ranked #11 in the top 20 USA manufacturing companies and #1 in New York City by Inc. 5000 "fastest growing private companies".

Evaluation ( 0 )
Write Your Review
Email is required
SUBMIT
Content is required

Buying FAQ — 1512

How do I buy 1512 from Yingxinyuan?

Open RFQ with quantity and target date, or upload a BOM that includes 1512. We reply with stock, channel note, reference price and ETA.

Is the listed price final?

Prices on the product page are reference only. Confirm unit price, currency and validity via RFQ before placing a PO.

How fresh is the stock figure?

Stock and reference price show an as-of date on the page. Ask for a live confirm — allocation lines can change daily.

How do you source authentic parts?

We source from manufacturers, franchised distributors and verified independents, then inspect incoming lots. See /anti-counterfeit/.

What is a typical lead time?

In-stock lines often ship within 24–48 hours after confirmation. Sourcing / allocation ETAs are quoted per line — see /lead-time-shipping/.